| PORT CHARGES at KAKINADA ANCHORAGE PORT |
| LANDING FEES |
| Sl.No. |
Commodity |
Unit of Charges |
Rate Rs. Ps. |
| (1) |
(2) |
(3) |
(4) |
| 1 |
Fertilizers all kinds in bags or bulk |
M.Tons |
25.00 |
| 2 |
Rock Phosphate in bulk |
M.Tons |
25.00 |
| 3 |
Cement in bags/Cement Clinker |
M.Tons. |
20.00 |
| 4 |
Rice in bags or bulk + sugar |
M.Tons |
25.00 |
| 5 |
Articles or goods not specifically enumerated in the schedule (other than passengers & Seamen’s baggage, ship provisions and stores) |
M.Tons |
25.00 |
| 6 |
Canal Borne cargo and/or passengers |
Boat load |
60.00 |
| 7 |
Timber or Bamboos in rafts (canal borne traffic) |
Rft. Of 10 Sq.m or part thereof |
60.00 |
| 8 |
Liquified Petroleum Gas |
1 CM |
115.00 |
| 9 |
Steel Pipes |
1 CM |
30.00 |
| 10 |
Crude Oil |
1000 Lts |
60.00 |
|
| SHIPPING FEES |
| Sl.No. |
Commodity |
Unit of Charges |
Rate Rs. Ps. |
| (1) |
(2) |
(3) |
(4) |
| 1 |
Iron Ore, Manganese Ore, Ferro Manganese Slag, Barytes Quartz, Gypsum, Pig Iron and all other ores in bulk |
M.Tons |
20.00 |
| 2 |
Feldspar, |
M.Tons |
25.00 |
| 3 |
Granite Stones/Blocks |
M.Tons |
30.00 |
| 4 |
Coal |
M.Tons |
25.00 |
| 5 |
Coking Coal, Lam Coal, Steam Coal |
M.Tons |
25.00 |
| 6 |
Thermal Coal |
M.Tons |
25.00 |
| 7 |
Rice Bran, Crushed bines, Horns, Hoofs, Palmyra Fiber |
M.Tons |
25.00 |
| 8 |
Groundnut Kernels |
M.Tons |
25.00 |
| 9 |
Rice in bags or bulk |
M.Tons |
25.00 |
| 10 |
Articles or goods not specifically enumerated in the schedule (other than passengers & Seamen’s baggage, ship provisions and stores) |
M.Tons |
25.00 |
| 11 |
Illuminated sand |
M.Tons |
22.00 |
| 12 |
Tobacco |
M.Tons |
0.10 Ad-valorem |
| 13 |
Canal Borne cargo and/or passengers |
Boat Load |
60.00 |
| 14 |
Timber or Bamboos in rafts (canal borne traffic) |
Rft. Of 10 Sq.m. or part thereof |
60.00 |
| 15 |
Liquified Petroleum Gas |
1 CM |
115.00 |
| 16 |
Steel Pipes |
1 CM |
30.00 |
| 17 |
Crude Oil |
1000 Lts |
60.00 |
|
| LANDING & SHIPPING DUES |
| Item No. |
Particulars of Articles |
Unit of charge |
Rate of Landing and Shipping dues |
| (1) |
(2) |
(3) |
(4) |
| 1 |
Heavy Machinery and other over Dimensional Cargo (ODC) |
-- |
Ad-valorem 0.25% on the CIF value of the cargo |
|
| GODOWNS/T.SHEDS |
| SCHEDULE |
Port Department having 30 Godowns total capacity 1,73,347.33 Sq.Feet.
Class – A Godowns / T.Shed – Rs. 50.00 per Square Metre, per month
Class – B Godowns / T.Shed – Rs. 25.00 per Square Metre per month
:There will be yearly enhancement by 10% and the rates proposed above shall be in force for a period of three (3) years and thereafter fresh revision takes place.” |
| LAUNCHES/PABLOES/WATERBARGES |
| DRAFT SCHEDULE |
Name of the Launch Water Barge |
Now reduced charges |
Hire |
1 |
2 |
|
Tugs & Launches:
1. TST Godavari 165+165
2. MT Machilipatnam 165
3. MT Calingapatnam 165
4. MT Kakinada
5. 150
6. MT Bheemunipatnam 235
7. ML Nizampatnam
8. MT Coringa 108
9. MT Satya 325 HP
10. Mechanised Boats
Barge hire for supply of fresh water:
1. Minimum 100 Metric Tons
2. Above 100 Metric Tons to 200 Metric Tons |
469
469
469
505
304
336
1223
249
97
80 |
|
| The revised rentals/annual license are as specified in the Table below: |
| Mode |
(per 10 Sq. Mt. or part thereof.) |
| Annual License System |
Rs. 300 |
| Monthly Rental Basis |
Rs. 30.00 |
| Weekly rental basis |
Rs. 30.00 |
|
| |
| PORT CHARGES at KAKINADA DEEP WATER PORT |
| I. A) Port Dues: |
| |
| |
All Sea going Vessels entering Deep Water Port. |
Rate per GT |
Frequency of payment in respect of the same. |
| 1. |
Foreign Vessels: |
|
Port Dues are payable for each entry. |
| a. Vessels handling cargo of 1500 tons or less |
US$ 0.24 |
| b. Vessels handling cargo above 1500 tons |
US$ 0.32 |
| 2. |
Coasting Vessels: |
|
Port Dues are payable for each entry. |
| a. Vessels handling cargo of 1500 tons or less |
US$ 0.16 |
| b. Vessels handling cargo above 1500 tons |
US$ 0.19 |
|
| II. A) Pilotage: |
| |
Fees for pilotage mentioned under is inclusive of towage (Using one or two tugs), mooring, un-mooring charges for each entry. |
| |
S.No. |
Size of the Vessel in GT |
Foreign Vessel per GT |
Coastal Vessel per GT |
1. |
Upto 3, 000 |
US$ 0.35 |
US$ 0.23 |
2. |
3, 001 to 30, 000 |
US$ 0.39 |
US$ 0.25 |
3. |
30, 001 and above |
US$ 0.55 |
US$ 0.36 |
|
| |
B) Detention Charges: |
| |
1. |
If the vessel is not ready to sail/shift/enter within half-an-hour of booking time for pilot boarding Detention Charges shall be levied as under: |
| |
|
|
Detention Fee |
a. First Half-an-hour
b. Thereafter per hour or part thereof |
US$ 350
US$ 500 |
|
| |
2. |
If the vessel is not ready to sail/shift/enter after the pilot boards the vessel the detention charges shall be levied as under: |
| |
|
|
Detention Fee |
a. First Half-an-hour
b. Thereafter per hour or part thereof |
US$ 250
US$ 500 |
|
| III. A) BERTH CHARGES FOR VESSELS: |
| |
| S.No. |
Size of the vessel in GT |
Unit |
Foreign Vessel Rate per GT |
Coastal Vessel Rate per GT |
| 1 |
Upto & inclusive of 3,000 GT |
Per day of 24 Hours |
US$ 0.16 |
US$ 0.063 |
| 2 |
3,001 to 5,000 GT |
Per day of 24 Hours |
US$ 0.11 |
US$ 0.042 |
| 3 |
5,001 to 10,000 GT |
Per day of 24 Hours |
US$ 0.099 |
US$ 0.0378 |
| 4 |
10,001 to 15,000 GT |
Per day of 24 Hours |
US$ 0.077 |
US$ 0.032 |
| 5 |
15,001 to 30,000 GT |
Per day of 24 Hours |
US$ 0.061 |
US$ 0.021 |
| 6 |
30,001 and Above |
Per day of 24 Hours |
US$ 0.100 |
US$ 0.032 |
| 7 |
Minimum Charges |
Per Vessel per day |
US$ 190 |
US$ 150 |
|
| |
B) SHIFTING CHARGES: |
| |
S.No. |
Description |
Charges per Shifting |
1 |
Without tug/tugs & Pilot |
US$ 235 |
2 |
With tug/tugs & Pilot |
US$ 1,310 |
3 |
With Pilot & without tug/tugs |
US$ 850 |
|
| IV. A) TOWAGE CHARGES: |
| |
S.No. |
Description |
Unit |
Charges |
1 |
Tug of 1, 000 HP & above but below 3, 000 HP |
First two hours or part thereof |
US$ 1214 |
2 |
Tug of 1, 000 HP & above but below 3, 000 HP |
Per every additional hour or part thereof |
US$ 607 |
|
| |
B) LAUNCH CHARGES: |
| |
S.No. |
Description |
Unit |
Charges |
1 |
Pilot Launch |
First two hours or part thereof |
US$ 131 |
2 |
|
Per every additional hour or part thereof |
US$ 66 |
|
| |
C) MECHANICAL EQUIPMENT: |
| |
i) |
Mobile Crane Charges: |
| |
|
Item No. |
Description |
Unit |
Unit Charges |
Minimum Charges |
1 |
Mobile Crane 20 Tons & Below |
Per Hour or Part thereof |
Rs. 450 |
Rs. 2250 |
2 |
Mobile Crane above 20 Tons but not exceeding 40 Tons |
Per Hour or Part thereof |
Rs. 675 |
Rs. 3375 |
|
| |
ii) |
Fork Lift Hire Charges: |
| |
|
Item No. |
Description |
Unit |
Unit Charges |
Minimum Charges |
1 |
Capacity upto 2 Tons |
Per Hour or Part thereof |
Rs. 315 |
Rs. 1575 |
2 |
Above 2 Tons but not exceeding 3 Tons |
Per Hour or Part thereof |
Rs. 540 |
Rs. 2700 |
|
| |
iii) |
Charges for Storage Fee: |
| |
|
Item No. |
Description |
Unit |
Slab – I (First 15 Days) |
Slab – II (Every 15 days from 16 th day onwards) |
1 |
Covered Space |
Per 100 Sq.M per fortnight or part thereof |
Rs. 5625 |
Rs. 11250 |
2 |
Open Space |
Per 100 Sq.M per fortnight or part thereof |
Rs. 675 |
Rs. 1350 |
|
| V. A) CHARGES FOR SUPPLY OF WATER TO VESSELS |
| |
Description |
Unit |
Rate |
Minimum Charges |
Supply of fresh water to vessels at berth. |
1000 Litres |
US$ 4.50 |
US$ 225 |
|
| |
B) CHARGES FOR STORAGE FEE |
| |
Item No. |
Description |
Unit |
Slab – I (First 15 Days) |
Slab – II (Every 15 Days from 16 th Day onwards) |
1. |
Covered Space |
Per Sq.M oer fortnight or part thereof |
US$ 125.00 |
US$ 250.00 |
2. |
Open Space |
Per Sq.M oer fortnight or part thereof |
US$ 15.00 |
US$ 30.00 |
|
| VI. A) WHARFAGE: |
| |
(CHARGES ARE IN INDIAN RUPEES) |
| |
No. |
Items |
Unit |
Wharfage (In INR) |
1. |
Acids of all kinds in bags, bulk or otherwise. |
1000 Kg |
30.00 |
2. |
Asphalt |
Ad valorem |
0.75% |
3. |
Barytes |
1000 Kg |
20.00 |
4. |
Cement & Clinker |
1000 Kg |
20.00 |
5. |
Chemicals in cases, drums or barrels |
Ad valorem |
0.60 % |
6. |
Chrome Ore & Feldspar & fullers Earth |
1000 Kg |
31.00 |
7. |
Coal |
1000 Kg |
27.00 |
8. |
Crude Oil, Furnace oil, Diesel Oil, Kerosene, Motor Spirit, Petrol and other oils |
1000 Litres |
78.00 |
9. |
Drugs and Medicines in bags, cases, drums, etc. |
Ad valorem |
0.25% |
10. |
Dunnage (mats bamboo’s and woods) |
1 CBM |
20.00 |
11. |
Edible Oils |
1000 Litres |
44.50 |
12. |
Electrical Goods |
Ad valorem |
0.25 % |
13. |
Fertilizers |
1000 Kg |
32.50 |
14. |
Fish and Shrimps |
Ad valorem |
0.02 % |
15. |
Grains, pulses and cereals of all kinds |
1000 Kg |
28.50 |
16. |
Granite Blocks |
1000 Kg |
43.50 |
17. |
Liquid Ammonia |
1000 Kg |
60.00 |
18. |
Liquid Petroleum Gas |
1 CBM |
149.00 |
19. |
Machinery and part thereof |
Ad valorem |
0.35 % |
20. |
Molasses |
1000 Litres |
43.50 |
21. |
Naphtha (bulk) |
1000 Litres |
78.00 |
22. |
Oil Cake |
1000 Litres |
20.00 |
23. |
Over dimensional Cargo |
Ad valorem |
0.35 % |
24. |
Palmyra Fibre |
1 CBM |
20.00 |
25. |
Phosphoric Acid |
1000 Kg |
60.00 |
26. |
Rock Phosphate |
1000 Kg |
20.00 |
27. |
Sugar |
1000 Kg |
28.50 |
28. |
Sulphuric Acid |
1000 Litres |
60.00 |
29. |
Industrial Salts |
1000 Kg |
20.00 |
30. |
Timber in logs, planks, scanting, squares |
1 CBM |
20.00 |
31. |
Tobacco |
Ad valorem |
0.13 % |
32. |
Un-Enumerated goods |
1000 Kg |
46.50 |
33. |
Unknown Goods
(Unit Which ever higher is applicable) |
1000 Kg / 1 CBM / Ad valorem |
47.00 /
47.00 /
0.35 % |
34. |
Wood Pulp |
1000 Kg |
40.50 |
35. |
Waste Paper |
1000 Kg |
40.50 |
|
| VII. A) CONTAINER: |
| |
No |
Items |
Unit |
New KDWP USD |
1. |
Port Dues |
GRT |
0.201 |
2. |
Pilotage Charges |
|
|
|
a) Upto 3,000 GT |
GRT |
0.330 |
|
b) 3,001 to 30,000 GT |
GRT |
0.355 |
3. |
Berth Hire Charges |
|
|
|
a) Upto 3,000 GT |
GRT |
0.150 |
|
b) 3,001 to 10,000 GT |
GRT |
0.092 |
|
c) 10,001 to 15,000 GT |
GRT |
0.063 |
|
d) 15,001 to 30,000 GT |
GRT |
0.040 |
4. |
Wharfage on Containers |
No Wharfage for Containers |
|
Wharfage on Export & Import cargo |
As per Schedule – VI |
5. |
Reefer |
|
|
|
a) Charges for Reefer points |
|
|
|
i) R 20 |
8 hours shift |
Rs. 330 |
|
ii) R 40 |
8 hours shift |
Rs. 385 |
6. |
Dwell time |
|
|
|
i) For empty |
|
|
|
a) First Seven days (for both R 20 & R 40) |
|
Free |
|
b) 8 th day onwards (for both R 20 & R 40) |
|
USD 0.13 |
|
ii) For Loaded |
|
|
|
a) First seven days (for both R 20 & R 40) |
|
Free |
|
b) 8 th Day onwards (for both R 20 & R 40) |
|
USD 0.13 |
7. |
Equipment – Top Loader |
|
|
|
a) For empty (for both R 20 & R 40) |
Per Move |
Rs. 275 |
|
b) For Loaded (for both R 20 & R 40) |
Per Move |
Rs. 385 |
|